Archive for November 2014
I have started work on the two 300 litre fresh water tanks on my Didi 40cr. This is twice the drinking water storage as we have on Passion and most of the time I carry just 40 litres, filling the tanks only for our cruising jaunts. Even the Beneteau 50 we chartered in the Whitsundays 14 years ago had only 1000 litres storage for six people so our 600 litres will be luxury for two.
The tanks form a for and aft structural member to share the keel loads amongst all the frames and they are the seats in the dinette. The photo shows the access holes in the top of the seats which are needed so that the skin side of the tanks can be coated with epoxy glass. The seat side faces will be glasses before the hull is skinned. The tank top on the left is glued in while the one on the right is sitting in loose in slots I installed to hold the panels for fitting and gluing. You can see the gap between the side and top where it will be glued and nailed later. Almost all the shelves have slots so that the shelves can be slipped into place.
It is getting more difficult to stay at the front of the Blue fleet at Greenwich Flying Squadron. Agrovation, the Jeanneau 379 has a larger No 1 genoa and both Izzi the Northshore 38 and French Connection the Jeanneau 38 are sporting new genoas. The new Dehler 38 is a bigger faster boat and as the crew gain more experience they are picking up fastest times. Worlds Apart will be back soon and we will be lucky to score in the top three.
With more fast yachts in the fleet we are not breaking away and as a result have to contend with slowing tactics from competitors and cannot sail our preferred lines. We did manage a second fastest on Wednesday night despite some unlucky timing of wind shifts which favoured the following yachts. Once the Dehler 28 was clear in the lead we were left to fend off multiple challenges to our second fastest position most notably from French Connection who seemed mighty pleased to be giving us a scare all night.
For a second week we took Out of Africa’s stern on the way through Humbug but this week there was more room to spare and no fright night on board Out of Africa.
We had the big black genoa up and as much power as we needed so there was no time for photos. Hopefully next week we will get back into tourist mode and have some happy snaps to show.
It has taken a while but now that the frames are glassed ready for installation in the hull I am satisfied with the result.
The photo shows the frames with the doubling blocks which compensate for wood lost to the keel bolts already bonded to the laminated beams and covered with 2 mm of epoxy glass laminate. The glass content is 2000 grams per m2 and will add strength as well as protecting the timber. Across the keel the section is 110 mm wide because I have made wider frames and increased the thickness of the doubling blocks to allow for 25mm keel bolts. It is a lot of work and not required for the standard design but then I do like strong yachts.
Readers of my Passion blog will know that I put three extra 80 mm wide by 160 mm deep keel floors and two extra keel bolts in my Jeanneau SO 37 to ensure a long trouble free life.
I should stop referring to the laminated floors as keel frames because they are just the top web of a compound beam made up of the laminated floors, the spacers between the frames and the hull and the plywood cover on the outside of the hull. It is like an I beam with the hull side section a piece of plywood equal in width to the frame spacing. In my case I am adding all that glass to the top web and will be adding glass to the outside of the plywood where it will give the most contribution to structural strength. There will be glass in the bilge to hold everything together and keep out the water but I have not included that in my considerations of the strength of the frames.
Tonight Gosford Laser sailors made up four of six the sailors on board. The welcome addition of two extra seasoned sailors made up for the otherwise occupied regular crew and to show our appreciation we managed a second fastest time.
Genoa selection was vital for a good result. The wind was gusting to 20 knots pre race and was expected to lighten in the evening. With the unfamiliar crew we opted for the roller furling No2 Genoa and were rewarded with a good run to Spectacle Island to lead the fleet at the turn. On the reach to Snapper Island the new Dehler 38 showed that power and waterline length are king in strong reaching conditions and by Snapper she had the inside overlap. To windward working to Goat Island we held the rest of the fleet at bay but had to watch as the Dehler 38 drew further ahead. With the incoming tide there were no fancy tracks to windward.
On the reach back from Goat in lighter conditions we had to watch Agrovation with their larger No 1 genoa approach our stern. With a bit of luck a ferry intervened and Agrovation took the route into the lee of Greenwich while we went wider and had more wind. The final tacks into Humbug were difficult as three fleets merged in the narrow water ways in shifty conditions. We tacked away to avoid one round up below and took the starboard tacking Out of Africa’s stern only to have to tack immediately to Starboard to avoid the next line of Starboard tackers. From here we had to pinch to stay above Out of Africa and keep ahead of Agrovation.
Handicap placings were close and we managed a fourth place
There has not been much action on the boat building front due to a trip to Perth and three scheduled sailing days since then. It took longer than expected to glue the doubling blocks to the middle of the keel frames and router the edges of the completed units. It also took longer than expected to lay up the first three layers of 495 gram unidirectional glass on the top web of the frame. That is the stage of the photo below. Since then I have added a further two layers to get my target 2 mm of high strength epoxy glass. I estimate the design strength for the unidirectional laminate to be 300 MPa or about six times the strength of the wood onto which it is bonded. Conceptually the 2 mm of very high strength epoxy glass is in tension equivalent to 12 mm of timber which would give a similar strength to a 60 mm frame compared to the 48 mm design. It is not quite the same as the extra depth of 12 mm timber would give different area moments to resist the keel but it is pretty close. Just to be conservative I have assumed a design strength of 150 MPa and I have topped off the five layers of unidirectional with a layer of biaxial under the keelson because once the keelson goes on there is no further opportunity to reinforce the frames. All this glassing is a lot of work and messy work at that but we are installing a deeper keel to improve the windward performance with more righting moment and more lift.
With a full crew back on deck the black genoa was hoisted and the improvement in performance was welcome. Right from the start we were in first or second place and we finished second fastest and second on handicap. To be fair to Passion we were a bit unlucky as we lead around Cockatoo Island by a good margin only to have Agrovation pick up a huge lift from behind. After that we stayed with them all the way to Goat Island only to be forced beyond the lay line by a black fleet J boat. In that delay Agrovation skipped out to half a minute lead.
At this stage the rest of the blue fleet was a few minutes behind but we had the company of the overtaking black fleet to keep us amused. We were pleased with the puff from behind on the way back to Long Nose. This private breeze brought us up to the stern of Agrovation and we made up ground on the black fleet. Agrovation was not about to let us slip through and she carefully covered us all the way to the finish.
Worlds Apart was involved in a pre race incident and did not make the start but the other boat to beat, the new Dehler 38, was behind at the finish so we must have done something right and the tracks indicate as much.
Today I fitted the keel frames to the hull of my Didi 40 Cr to check that they were all true. In the process I drilled pilot holes for the keel bolts to ensure that they are in the middle of the frame. Now that the fitting is complete the frames have to be returned to the workshop to have the doublers added to the front face and to be reinforced with glass. Only then will I be able to fit them permanently in the hull.