The last little frame has been bonded to the hull. this is the small frame under the chart table seat. There are three spacers holding it parallel with the adjacent frame. Another photo is the second last frame and it is the side of the vanity in the head. One spacer has been left in place after the glue has dried to keep it steady. And the third last frame was the side of the hanging locker in the quarter berth ante room. I am just showing the top (bottom if you are right way up) part as the light is too strong to show the rest of it. The photos show a range of construction techniques including using spacers to hold frames level with adjacent frames and timbers clamped to frames to keep the plywood straight until the glue on the frame cures.