Despite the cold weather we are experiencing the sunny windless days are perfect for maintenance work on Passion X.
Several weeks ago we were embarrassed when as port tacking yacht we could not find a gap between the starboard running yachts. Now if it was the world championships or even the last day of a regatta we could understand a hole not opening up for us but one did not and we hit a friend and damaged the overhang on the sugar scoop transom on Passion X. I promptly glued up the damage and while it was coated with plenty of epoxy it still needed a final capping piece to complete the work.
Saturday was a perfect day for the task and I fabricated a capping piece from 12 mm hardwood plywood using the old shattered capping piece as a template. it worked a treat and the new piece was splice joined into the good section out on the water. Today was the only time I had to do some final filling and fairing as I have a busy week ahead. The longest part of the process was sanding off the two pack polyurethane resin from the areas adjacent to the work so that the new epoxy coating would stick properly.
Tonight is is all done and with the surplus two pack epoxy I tidied up some of the nicks in the transom from the storm damage at Port Stephens back in April. The nicks had been filled with epoxy filler but it was discolouring with age and needed tidying up.
The job is not finished as the epoxy needs more filling and fairing but for now it is all white and water tight.
I took the opportunity to remove some surplus tools from Passion X which will be of benefit in the coming week as the forecast for Wednesday looks pretty light.