Passion X is back in the water ready for another season. The sprayed on antifouling looks very slick and I am very happy with the quality of the service at Woolwich Dock. The proximity to our mooring in Greenwich Bay is a great convenience and I motored the dinghy over on the Torquedo outboard to pick up Passion X from the dock and used just 20% of the battery power for the task.
While Passion X was on the hard stand I torqued up the rear keel bolts with the load of the hull sitting on the keel and got a tiny movement in the back nut so that should be right for the life of the yacht.
I have opened up the hole for the dyneema bobstay at the bow as I want to increase the size of the bobstay so that I can tension up the luff rope of the Code Zero sail. I think with a bit more tension we will improve the pointing angle and also be prepared to carry it on broad reaches in heavier airs. I have the bowsprit off at present for cosmetic treatment as i want to see how it looks in the light grey trim instead of the clinical white of the hull.
The last job was a touch up of the stern where the sharp edge of the sugar scoop stern has been hitting the dock. The angle of the stern leaves the sharp edge of the hull to sugar scoop join slipping under the dock fenders and I feel it would be more practical to have the last 100 mm of the stern cut off vertical. Not only would it be easier to protect the stern we would have 100 mm less water line length in the rating equation. in the meantime the touch up was very minor and an interim measure might be a bit of vinyl wrap.
Today in warm spring conditions a small team of GFS safety auditors finished off another seven yachts ready for the start of the sailing on next Wednesday.

Waiting for the antifouling to harden before the relaunch

Waiting for the antifouling to harden before the relaunch

Ready for the relaunch

Ready for the relaunch

Another angle on the finished antifouling

Another angle on the finished antifouling

Comments are closed.