I will try to insert a few photos in a separate post.
Since the site was hacked I have had multiple problems with posts. One of the issues was that my phone started saving photos is a hjgh definition mode that was not recognised by WordPress. That has been fixed by setting the phone to JPEG only.
Another issue is the appearance of the photos on the site as they do not present as consistently as before. I am not sure if this is a WordPress issue or an update to the Photo app on the computer which rezises photos in a different way.
So this is an attempt to get some photos up and learn by doing.
Settee backs glued in place with water filler and breather pipes installedAll the head components are aligned with the laser level and pre cut and fitted prior to disassembly and painting. This photo shows the wet locker on the side, the access to the vanity and the vanity surrounds. The cleat on the bulkhead is a remnant from a previous layout and has since been removedQuarter berth lockers in progress. I had to remove the support on this bulkhead to fit the front so I will do one locker at a time reinstating the support after the front is glued in place. Since this photo the bare plywood has had one coat of primer and the locker font also one coat.